百级净化室工程一直是净化界的重要研究方向,因为涉及范围广,包含建设水电、空调、环保、防震等一系列工程,需要全方位的人才策划方案,为了减少出错率就需要在施工前好好策划工程的相关注意事项。
净化室方案策划关键:
1.作业者、资料、化学药品等动线勿会集。
2.制作装置之收支,需不对作业发生大影响。
3.超洁净室四周,宜设缓冲区(即较差洁净区)。
注意事项:
1.洁净度等级。
2.室压之平衡办法。
3.温湿度要求。
4.机器设备之必要性。
5.断定生产流程。
6.部分排气之必要性。
7.日后扩大弹性。
8.满足保护保养空间。
9.空调送风方法。
10.职工歇息区之安排。
11.设施与动力之装备。
12.室内净高与楼板载重。
13.设备空间与管道间。
14.门窗宜少,气密性要佳。
15.静电、振荡及噪音。
16.生产线与活动线少穿插。
17.公害、污染与防灾。
18.装置及工作成本之衡量。
对于物料、人员的通道路线行业术语为动线,在设计时要加入考虑方案中,施工时,要重复分析工作人员的通道、物料的通道、配置设备、排气管道、物料运输等作业流程,尽量缩短动线,并避免穿插,以避免穿插污染。
Key construction items in the project of 100 grade purification room
100 grade purification room project has always been an important research direction of the purification industry, because it involves a wide range of projects, including building a series of projects such as hydropower, air conditioning, environmental protection, earthquake prevention and so on. It needs a comprehensive plan of talent planning. In order to reduce the error rate, it is necessary to carefully plan the related matters before the construction.
Purification room scheme planning key:
1. operators, materials, chemicals and other moving lines should not be collected.
2. the revenue and expenditure of the device should not be greatly affected.
3. a buffer zone should be set up around the clean room.
Matters needing attention:
1. cleanliness grade.
The balance method of 2. chamber pressure.
3. temperature and humidity requirements.
4. the necessity of machine equipment.
5. determine the production process.
The 6. part of the exhaust is necessary.
7. days after the expansion of elasticity.
8. to meet the protection and maintenance space.
9. air conditioning air supply method.
10. arrangements for the rest area of the staff and workers.
11. facilities and power equipment.
12. indoor net height and floor load.
13. the space between the equipment and the pipe.
14. doors and windows should be less, air tightness is better.
15. static, oscillating and noise.
16. the production line is less interspersed with the active line.
17. public hazards, pollution and disaster prevention.
18. the measurement of the equipment and the cost of work.
For materials and personnel, the line line industry terminology is moving line, in the design to join the consideration of the project, during the construction, we should repeat the analysis of staff channel, material channel, configuration equipment, exhaust pipe, material transportation and other operational processes, as far as possible to shorten the line, and avoid penetration, in order to avoid interspersing pollution.